1. Identify the exchange
Capture the business need, partner specification and existing system. Confirm the result each document should produce and the data it requires.
2. Agree the solution and ownership
Define interfaces, mappings, validation and responses. Responsibilities across Ediprism, your team, software vendor and partner must be documented alongside prerequisites.
3. Test realistic scenarios
Agree inbound and outbound examples, amendments, retries and exceptions. Testing verifies final-system data and partner responses. Timing also depends on access and third parties.
4. Prepare go-live and continuity
Determine monitoring ownership, incident escalation and maintenance before operation. Version and specification changes need a review, testing and acceptance process.
Before you choose a provider
How long does it take?
Timing is estimated once interfaces, scope and participant availability are known. No universal deadline is promised for every system and partner.
What should our team prepare?
An operational owner, technical contact, interface documentation and anonymised examples. Access and live data will use appropriate channels.
What is Ediprism?
Ediprism is an Ecofin Cloud solution integrating EDI between your software and third-party systems. It receives, transforms and sends information through agreed interfaces.
Does Ediprism work in both directions?
Scope can include inbound, outbound or both, defining data exchanged and responses confirming each result.
Must I replace my software?
The proposal starts with existing systems. Interfaces, functions and permissions are reviewed; configuration or adaptation may be needed.
Can I keep my EDI provider?
Assess the connection from the existing service to your software, checking available interfaces and stages already covered.
Which formats and protocols are supported?
Scope identifies formats, versions, protocols and partner guidelines. Available capabilities and required adaptations must be confirmed.
How much does integration cost?
Cost depends on partners, documents, interfaces, rules and tests. Separate implementation, adaptations, third-party costs and maintenance.
How long does implementation take?
Timing depends on scope, access and participant availability. There is no universal deadline for all systems and partners.
Who maintains the connection?
Agree responsibilities across Ecofin Cloud, your team, software vendor and partners, including changes and incidents.